Appendix A – M24 Fluokit Disposal Procedures. Fluokit Indoor Ring Main Units contain Sulphur Hexafluoride (SF6) gas as an insulating medium which is. AIR INSULATED SWITCHGEAR. FLUOKIT M+ MV modular switchgear up to 24kV. Technical Specifications. AREVA T&D. Summary. Cubicle equipment. FLUOKIT M+ cubicles include the following features: Operating Cubicles in the FLUOKIT M+ range all have functional . Fluokit M24 & M24+ meets your.

Author: Tojagore Vujind
Country: Maldives
Language: English (Spanish)
Genre: Love
Published (Last): 25 January 2015
Pages: 376
PDF File Size: 1.42 Mb
ePub File Size: 16.57 Mb
ISBN: 890-4-41813-824-7
Downloads: 55401
Price: Free* [*Free Regsitration Required]
Uploader: Shaktikasa

The interventions described are carried out on de-energized equipment in the course of being installed or locked out non operational.

Brosur Cubicle Fluokit m24 – [PDF Document]

Layout on a type 2 cable trough, with width of more than 50cm. Our products are fully quality controlled and tested at the fluokti in accordance with the standards and regulations currently in force. The interventions described are carried out on de-energized equipment in the course of being installed or locked out non operational.

Layout on a type 2 cable trough, with width of more than 50cm Whenever the width of the cable trough exceeds 50 cm, it is necessary to fit the longitudinal support irons to support the left and right-hand uprights for each Functional Unit.

  COTURNICULTURA EN COLOMBIA PDF

Painted sheet steel 2 mm thick.

FLUOKIT M+ 24kV | Schneider Electric

Work on the Civil Engineering structure. It is therefore generally installed on the side of the road. Reserve opening at the extremity of each rail.

Each profile section comprises, every mm, a fixing plate welded and drilled with 2 holes of Not respecting these instructions is likely to invalidate any guarantee.

Access to the substation Substation access must remain free at all times and under any circumstances. Except when it is imposed, the wearing of the gloves has been voluntarily limited in this manual so as to have clear visuals of the hands and operations described.

Geometry of the cable trough. If this is not the case, please refer to our Service Unit or Training Centre. Schneider Electric request the carefully reading of the following instructions in order to familiarize yourself with the product in this document before trying to install, operation, put into m2 or conduct the maintenance on it.

The other brand names mentioned within this document, whether they be copyright or not, belong to their respective holders.

Schneider Electric, the Schneider Electric logo and their figurative forms are Schneider Electric registered trademarks.

It is necessary for anchoring the profile sections to the floor. Respect the imposed distances see chapter 5. It’s a community-based project which helps to repair anything. Definition of the substations.

  ENGEO PLENO BULA PDF

Beyond this, account must be taken of the decrease in dielectric withstand.

The average water vapour pressure over a period of 24 hours must not exceed 22 mbar. Threaded fasteners with grease: This opening must have a section of about 40x40mm to allow for the passage of the 25mm2 cable.

FLUOKIT M+ 24kV

All manipulations must be completed once started. Protection equipments Only qualified and accredited people can operate on our products.

Symbols of information 06 Code for a product recommended and marketed by Schneider Electric 21 Nm Tightening torque value Example: The correct functioning and lifespan of the product depend on respecting the installation, commissioning and exploitation instructions found in this manual. Realign the passage on the front inner edge of the cable trough.

The safety alert symbol shall not be used with this signal word. Complete this assembly by the lateral irons. Installing the Functional Fluikit to the floor. No ducts of any kind must pass through the substation’s immediate environment without special protection sheaths or ducts.