Power Plant Labelling Sytem (KKS Numbering Code) Checklist for Civil Procedure. a helpful checklist when running through a civil procedure exam. Mar 8, MEDUPI POWER STATION I Doc No-: KKS01 I Rev: 1 KKS CODING AND LABELLING Doc Type: Procedure Page 2 of 26 Contents 1. Purpose. Procedure for Plant Identification(KKS Numbering System). Uploaded by Tung Hoang Power Plant Labelling Sytem (KKS Numbering Code). Uploaded by.

Author: Kajilar Mot
Country: Guatemala
Language: English (Spanish)
Genre: Art
Published (Last): 5 April 2006
Pages: 97
PDF File Size: 17.3 Mb
ePub File Size: 8.94 Mb
ISBN: 244-5-39476-757-5
Downloads: 95101
Price: Free* [*Free Regsitration Required]
Uploader: Kagaktilar

On breakdown level 2 supports should be identified by BQ.

X — Heavy machinery not main machine sets Where measured data are corrected e. Inosanto Numbering System Inosanto Kali notes.

It should be decided on a case- to-case basis which numbering convention is best suited to the extend and structure of the systems and plants to be identified. Read from left to right no data characters may be omitted. Format of Code I – 2.

Steam system common to LA. H — Subassemblies of main and heavy machinery Remember me Forgot password? In case of single closed regulation circuits, it is divided into 2 parts: Control and Instrumentation Equipment I – 5. Mechanical Service Systems Mechanical service systems which serve more procedre one main group identified on breakdown level 1 are identified as auxiliary or ancillary systems in separate main groups F1 by means of the following coding letters: Because relevant design progress have been done too much.

  MAGE THE AWAKENING TOME OF THE WATCHTOWERS PDF

Special Rules for Mechanical Engineering Fictitious rooms in structures may be identified by numbering or coordinate systems.

Identification System for Power Stations (KKS)

System One should remember, that the code of a system must consist of five symbols: Help Center Find new research papers in: For this purpose, data character B1 can contain: The contents of this designation in KKS, is left for coordination for particular power plant. The alphabetical symbols of this breakdown level are used to classify and divide the overall plant into subsystems, systems or building structures. The procedrue breakdown levels are differently formatted.

Proocedure valid rules on the use of FN numbering proceeure not expedient. Assignment of System Codes to Mechanical Equipment and Measuring Circuits Equipment units are identified according to the system within the interfaces of which they are located. Types of Code and Breakdown Levels G — Electrical devices Cooling water system – Closed cooling water system – Compressed air system Rev.

Identification System for Power Stations (KKS)

Numbering begins anew for each structure. A breakdown level 2 is used to identify the installation space.

  ARTHUR JANOV TERAPIA PRIMAL PDF

C — Direct measuring circuits EZ Protection For example: Introduction Identification System is based on the Kraftwerk – Kennzeichen – System KKS This System is the basis for the standard and clear identification of all installations and subsystems in power plant. F General rules on other numbering code elements Fn, An, Bn. Function-Interfacing Analog Signal Processing Where control and instrumentation equipment serves more than one process system identified in F2 and F3, the letter Y for generic control and protection systems may be used in the appropriate data character on breakdown level 1.

A working party, consisting of planners, operating companies, authorized inspectors and other authorities, was set up in with the task of finding such a solution. The prefix number is used in cases when for instance in compass of one power unit appear two or more identical subsystems two boiler plants, two turbosets, etc. Installation Unit Code Serial no.